An underground house sits entirely below grade, while an earth-bermed house uses soil to cover one or more walls and sometimes the roof. Both are earth-sheltered homes. The soil can moderate indoor temperatures, but it also adds structural loads and makes waterproofing, drainage and access to daylight central to the design. Concrete Masonry & Hardscapes Association
| Main types | Bermed (elevational or penetrational) and underground atriumDOE Energy Saver (quoted copy); CMHA TEK 06-07A |
|---|---|
| Ground temperature | About 50 to 60 °F at 10 ft below groundUS EIA |
| Soil load on walls | 30 to 60 psf per foot of depth in IRC prescriptive tables; 60 to 100 at-rest in IBC Table 1610.1IRC Table R404.1.1; IBC §1610 |
| Earth on the roof | 24 in of wet sand and gravel weighs about 240 psf, against 30 to 40 psf floor live loads (worked example)ASCE 7-02 Table C3-2; IRC Table R301.5 |
| Water | Waterproofing, not just dampproofing, for below-grade living space; ground falls 6 in in the first 10 ftORNL Builder's Foundation Handbook; IRC R401.3 |
| Bedroom escape | Each sleeping room needs an opening of at least 5.7 ft², sill no higher than 44 inIRC R310 |
| Radon | EPA action level 4 pCi/L; test after moving inEPA |
| Cost | Estimates of $250 to $450 per ft² for earth-sheltered homes, against a $166 per ft² median for conventional custom homes (2024)LatestCost (estimate); NAHB |
Three types of earth-sheltered house
There are two broad categories, bermed and underground. Elevational and penetrational houses are bermed; an atrium house is underground. These definitions come from the U.S. Department of Energy’s Energy Saver guide. That page is offline, so the link goes to the full text as reproduced by Natural Building Blog. DOE Energy Saver text reproduced by Natural Building Blog

Elevational (bermed)
One face is exposed, often on the downhill side of a slope, while earth covers the other sides and sometimes the roof. The exposed face usually points south. Plans tend to be long and narrow so bedrooms and main living spaces can share that wall for daylight and escape openings. Skylights can serve rooms farther back. CMHA describes this as generally the simplest and most economical type to build. CMHA’s earth-sheltered building guide
Penetrational (bermed)
The house is usually built at ground level, with earth placed around it and over the roof. The berm is held back at windows and doors. Openings on several sides can bring daylight deeper into the plan and allow cross-ventilation. This gives the designer more flexibility to use a conventional room layout. CMHA’s earth-sheltered building guide
Atrium (underground)
On a typically flat site, rooms sit below grade around an open courtyard. Windows and glazed doors face the courtyard, and a stair connects it to ground level. The courtyard offers privacy and shelter from winter winds, though window placement can limit passive solar gain. Its floor needs a drainage strategy and a way to handle snow. DOE Energy Saver text reproduced by Natural Building Blog
| Type | Daylight and air | Layout and exits | Build notes |
|---|---|---|---|
| Elevational (bermed, one open face) | One fully open face, usually south; skylights may be needed for north rooms | Long, narrow plans so bedrooms and main rooms line the open wall | Called the simplest and least expensive type by DOE, and the easiest and most economical by CMHA |
| Penetrational (bermed all round) | Light from more than one side; cross-ventilation possible | More conventional plans are possible | Earth is retained around each window and door opening |
| Atrium (fully underground) | Light only from the courtyard; passive solar gain likely limited | Reached by a stair down to the courtyard | Courtyard drainage and snow removal need design; usually under 3 ft of earth cover |
Sources: DOE Energy Saver, "Efficient Earth-Sheltered Homes" (as quoted in full by Natural Building Blog; the DOE page was offline when checked on November 22, 2026) and Concrete Masonry and Hardscapes Association TEK 06-07A.
Energy savings and indoor comfort
The U.S. Energy Information Administration gives a ground temperature of roughly 50 to 60 °F at 10 ft below the surface. A buried wall can therefore face a smaller temperature difference than an exposed wall during outdoor temperature extremes. Earth cover can also reduce air leakage through walls. U.S. Energy Information Administration, CMHA’s earth-sheltered building guide
Earth cover still leaves a job for insulation. Exterior insulation can keep the thermal mass of the wall inside the insulated enclosure and help protect the waterproofing. Oak Ridge National Laboratory’s foundation handbook notes that an uninsulated conditioned basement can account for up to half the heat loss in a tightly sealed house with good above-grade insulation. CMHA’s earth-sheltered building guide, Oak Ridge National Laboratory foundation handbook
A 1982 Oak Ridge study used simulation to estimate 30% less space heating and 26% less cooling for an earth-covered office and dormitory compared with an energy-efficient above-grade building. A 1986 analysis of measured residential energy use found that earth-sheltered homes in its coldest climate group could perform comparably to superinsulated homes for heating, but the authors called for a larger sample. These studies are decades old. Modern measured whole-house savings data for U.S. earth-sheltered homes was unavailable for this guide. 1982 Oak Ridge study, 1986 residential energy study
What the soil does to the structure
Roof soil adds a permanent vertical load. In a worked example, 24 in of wet sand and gravel at 120 lb/ft³ adds 240 lb/ft² from soil alone. The roof assembly and other applicable loads also have to be accounted for. ASCE 7-02, Table C3-2
Buried walls also resist sideways pressure that increases with depth. The International Residential Code (IRC) uses 30, 45 or 60 lb/ft² per foot of depth in its prescriptive basement wall tables, depending on the soil group, for moist conditions without hydrostatic pressure. The International Building Code (IBC) Section 1610.1 generally calls for at-rest pressure when a wall is restrained at the top. Its table gives at-rest values of 60 to 100 lb/ft² per foot of depth for listed soils suitable for backfill. Water pressure and surcharge loads can add to the design load. 2021 Utah IRC, Chapter 4, 2021 Utah IBC, Section 1610
Owner-built houses have skipped this step before. In a 1980 survey of Oklahoma earth-sheltered houses, 64% had been designed without professional structural advice, which the authors called "a substantial degree of risk." That data is more than 40 years old. Today's code spells out when engineering is required. 1980 Earth Sheltered Housing Conference proceedings
IRC Section R404.1.1 calls for engineered design under specified conditions, including hydrostatic pressure from groundwater. Section R301.1.3 covers structural elements outside the prescriptive limits. Have an engineer design the structure, waterproofing and drainage together for the site. Your locally adopted code edition and amendments govern. 2021 Utah IRC, Chapter 4, 2021 Utah IRC, Chapter 3
Water, waterproofing and drainage
Check the seasonal water table and soil drainage before committing to a floor elevation. The Oak Ridge foundation handbook recommends a crawl space or slab-on-grade foundation where a basement floor could sit below the water table. A basement built below groundwater needs continuous waterproofing beneath the slab as well. Oak Ridge National Laboratory foundation handbook

Give water a path away from the building at the surface and below grade. IRC Section R401.3 calls for the ground to fall at least 6 in within the first 10 ft away from the foundation, with drains or swales where that fall is impractical. Section R405.1 generally requires foundation drains around concrete or masonry foundations that retain earth and enclose usable below-grade space, with an exception for well-drained Group I soils. A drainage board can carry water down to a footing drain set in gravel, with discharge by gravity or mechanically. 2021 Utah IRC, Chapter 4, Oak Ridge National Laboratory foundation handbook
IRC Section R406.1 addresses dampproofing. R406.2 requires waterproofing where a high water table or other severe soil-water conditions are known to exist. Oak Ridge generally recommends waterproofing for below-grade living space because a dampproof coating can still let water through. Coordinate the membrane with the exterior insulation and the drainage layer before backfilling. 2021 Utah IRC, Chapter 4, Oak Ridge National Laboratory foundation handbook
Dampness can also come from indoor air condensing on cool surfaces. Exterior insulation can keep the interior wall surface warmer, and summer conditions may call for mechanical dehumidification or air conditioning. The EPA recommends keeping indoor relative humidity below 60%, ideally between 30% and 50%. CMHA’s earth-sheltered building guide, EPA guidance on mold and moisture
Daylight, ventilation, egress and radon
Lay out bedrooms around the exposed wall, courtyard or usable window wells early. IRC Section R303.1 generally calls for glazing equal to at least 8% of a habitable room’s floor area and openable area equal to at least 4% for natural ventilation, with exceptions. For a low-leakage earth-sheltered house, plan for mechanical ventilation even if the layout allows cross-ventilation. 2021 Utah IRC, Chapter 3, CMHA’s earth-sheltered building guide
IRC Section R310 generally requires an operable emergency escape and rescue opening in each sleeping room, opening directly to a public way, yard or court. The minimum net clear opening is 5.7 ft² (0.530 m²), or 5.0 ft² (0.465 m²) for a grade-floor opening. The sill can be no more than 44 in (1,118 mm) above the floor. Below-grade wells have their own requirements, including a minimum horizontal area of 9 ft² and a permanently attached ladder or steps where the well is deeper than 44 in. 2021 Utah IRC, Section R310
Plan for radon-resistant construction and test the finished home. Where locally adopted, IRC Appendix AF addresses measures such as a gas-permeable layer under the slab, a soil-gas retarder, sealed penetrations and a vent to the roof. The EPA recommends fixing homes at or above 4 pCi/L (150 Bq/m³) and considering mitigation between 2 and 4 pCi/L. 2021 Utah IRC, Appendix AF, EPA radon action level
How much does an underground house cost?
LatestCost’s 2026 earth-sheltered home guide estimates $250 to $450 per ft² excluding land, or $375,000 to $675,000 for a 1,500 ft² home. Its separate 2026 underground house guide estimates $180 to $640 per ft². The same publisher gives two different ranges, and modern measured cost data is scarce. LatestCost earth-sheltered estimate, LatestCost underground house estimate
For comparison, the National Association of Home Builders reported a 2024 median of $166 per ft², excluding the lot, for new contractor-built custom single-family homes. On an earth-sheltered project, price the excavation, reinforced shell, waterproofing, drainage and engineering separately. Rock and groundwater affect the site work, and wells for daylight and emergency escape add scope. NAHB’s 2024 custom-home figures, LatestCost earth-sheltered estimate
Planning an earth berm and estimating soil
Start with the berm height and crest width, then choose the slope and mark which sides receive soil. Enter roof cover and excavation depth so you can compare the fill needed with the volume dug out. Check with the engineer which excavated material is suitable for reuse as fill.
Berm soil calculator
Soil quantities for an earth-bermed house: berms against the walls you choose, earth on the roof, and the dig. Quantities only. It does not check structure, drainage or slope stability.
Berms are modelled as straight slopes from a flat crest at the wall, with hip-shaped corners where two bermed sides meet. The compaction allowance adds extra soil to reach the finished compacted volume; WisDOT gives about 10 to 15% for clean sands and up to 25 to 35% for clays. Fill steeper than 2:1 needs a geotechnical report under IBC Appendix J. Tandem dump trucks usually carry 12 or 14 yd³ (TxDOT). Excavation is the footprint times the depth below grade, without over-dig for footings or drainage. Check slopes, drainage and wall design with an engineer.
- 2:1 means 2 ft horizontally for each foot of rise. It is the steepest fill slope IBC Appendix J allows without justification: Section J107.6 requires engineering data or a geotechnical report to justify steeper fill slopes where that appendix applies. 2021 Utah IBC, Appendix J
- 3:1 is the slope at or below which Section J109.1 does not require drainage terraces. TxDOT advises avoiding mowing at this slope or steeper. 2021 Utah IBC, Appendix J, TxDOT mowing guidance
- 4:1 uses more land. A 2019 Iowa Farmer Today safety article says most residential tractors and mowers are designed for slopes no steeper than 1 ft of rise in 4 ft of run. Check the limit for your machine. Iowa Farmer Today mower safety guidance
In a worked example, an 8 ft berm at 3:1 needs 24 ft of horizontal run for the sloping face alone. Allow additional room for the crest. IBC Appendix J slope conventions
The calculator starts with a 15% compaction allowance. WisDOT lists typical allowances of 10% to 35% depending on soil type. Excavating can also increase soil volume as it loosens, so distinguish soil in place, loose trucked soil and compacted fill. The truck default is 12 yd³ per load, one of the usual tandem-axle bed capacities reported by TxDOT. WisDOT soil volume study, TxDOT haul truck capacities
Underground house plans
When comparing berm house plans or browsing for hobbit house plans, look for a section through the deepest buried wall. A concept should show existing and proposed grade, the extent of roof cover, how rooms get daylight, where bedrooms have escape openings, and where footing and courtyard drains discharge.
The University of Minnesota’s Underground Space Center compiled plans, construction information and energy data for 23 U.S. and European examples in its 1981 book Earth Sheltered Homes: Plans and Designs. Skiaform is preparing an earth-bermed concept design. Join the list below to hear when it is ready. Book record at the U.S. Department of Energy’s OSTI
Concept design. Not for construction.
Earth-sheltered homes in practice
Architect Malcolm Wells turned toward what he called “gentle architecture” after designing the RCA pavilion for the 1964 World’s Fair. He used skylights to bring daylight into underground buildings. Mike Oehler took an owner-builder approach and published The $50 & Up Underground House Book in 1978, drawing on his own building experience. Architectural Record on Malcolm Wells, Mike Oehler author biography
In Coober Pedy, South Australia, about half the residents live underground, according to NASA’s 2023 account. Homes cut into the local bedrock stay around 73 °F (23 °C), and ventilation shafts let moisture escape in the arid climate. NASA Earth Observatory on Coober Pedy
FAQ
Are underground houses cheaper to build?
The sources we found do not show it. Current estimates vary widely, and LatestCost's 2026 ranges sit above NAHB's 2024 median for conventional custom homes. A 1980 Oklahoma survey found costs comparable to above-grade houses, but that data is old. An elevational bermed design can simplify construction, while a fully underground atrium design adds excavation and a courtyard that needs drainage. Compare site-specific bids that include the shell, waterproofing, drainage and engineering. CMHA’s earth-sheltered building guide, LatestCost’s 2026 earth-sheltered estimate
Do underground houses leak?
They can. A 1980 Oklahoma survey found several serious individual leaks among the homes studied. That historic experience illustrates why the grading, footing drains and waterproofing all matter. If a room feels damp, check for condensation as well as water entry. 1980 Earth Sheltered Housing Conference proceedings, Oak Ridge National Laboratory foundation handbook
Can you get a mortgage on an earth-sheltered home?
A historic 1980 Oklahoma survey found that roughly 70% of the owners surveyed had obtained financing. Current lender and appraisal data was unavailable for this guide. If you’re buying an existing home, ask for the stamped plans, soil report and history of leaks or insurance problems so you can discuss the specific property with your lender and insurer. 1980 conference proceedings, 1983 guide to buying an earth-sheltered home
How deep does an underground house need to be?
Choose the floor elevation and roof cover based on groundwater, soil loads, daylight and escape routes. CMHA says atrium buildings typically have less than 3 ft (0.91 m) of earth cover and that greater depths offer little additional energy benefit. CMHA’s earth-sheltered building guide
Are underground houses legal?
Check with your local building department about the proposed site and design. The locally adopted code governs structural design, foundation drainage, waterproofing and emergency escape openings. Ask which amendments apply and whether the jurisdiction has adopted the radon appendix. 2021 Utah IRC, building planning, Foundations, Radon control methods
Get the earth-bermed concept design